Sunday, April 24, 2011

Gregory's Eagle Project: FINISHED!!!

April 23, 2011: The final project work day--at Lake Ridge Park to install all the signs. I took Gregory to home Depot at 7am to rent a power auger to drill holes for the posts. People started gathering at the park by 8am, and without much ado, everyone set to work under Gregory's direction. Gregory had 8 reserve signs/name signs on posts to put in the ground at the various picnic areas and pavilions, an additional 4 name signs to attach to wooden pavilions, and a two-post sign at the docks regulating boat traffic during crew practice times to install.


Gregory sent a team out to the four wooden pavilions
to remove the existing reserve signs and screw on the
new name signs. Here are Ben Rasmussen and Kristy Graff
hard at work!

Great results!

Another team carried posts and signs to designated
areas for installation

and to drill the holes for the posts.

Again, superb results!

Dad, with a new reserve sign in the ground.

Final step, to put in the crew sign at the docks. This
took a little longer since all the cordless power drills
had lost their umph by this time, and Ben had
to go pick up another drill from Aaron Lattin.

Congratulations, Gregory! We are so proud of you!
Thanks to everyone who helped make this successful!

Gregory's Eagle Project: Part II

March 19, 2011: Gregory's next step was to put the signs together and stencil the lettering on. He had quite a group of ward members come to our house to do the work, and he directed their labors expertly.

Patrick Wells and Dave Johansen putting on hinges, hooks, and screw eyes.

The Weaver family stenciling lettering on the crew sign.

Mom making stencils with Gwen Reese's Cricut Cutter.

Christian Graff staple-gunning vinyl pockets onto reserve signs.

Name signs for the pavilions and picnic areas.

Crew sign for the docks.

Reserve signs
Looking good. . .

Gregory's Eagle Project: Part I

Gregory's Eagle Project: February 26, 2011
After much investigation and consultation with various county organizations, Gregory decided to do a service project for Lake Ridge Park in our neighborhood. Gregory rows on Gar-Field High School's Crew Team, which uses the docks at LR Park for practices, along with four other high schools, and so he felt a desire to do something to improve the park that he uses so often. The park manager, Jane England, proposed several possible projects, and Gregory chose to make reserve and name signs for the eight picnic areas and pavilions in the park; and also to make a sign for the crew teams to regulate dock usage while the teams are practicing.
Gregory approached the store manager at Home Depot about discounts and donations for the materials he needed to make the signs. Mr. Vernon Maupin was so impressed with Gregory's manner and professionalism. He agreed to give a 10% discount on all wood purchased from Home Depot, and all other materials (such as hardware, paint, hinges, etc.) would be donated free of cost.
Gregory's first work day was dedicated to painting all the wood brown--6x6 posts, 4x4 posts, and boards for signs.

Christina and her brown fingers.

Dad painting signs

Gregory painting posts.

Our own little "Stonehenge" in the garage!

Wednesday, April 6, 2011

Irrepressible Spring



Nothing can keep Spring from coming: not a timid groundhog who's afraid
of his shadow nor a late March snow with sub-freezing temperatures;
not last season's detritus nor an overabundance of weeds;
not 40 mph gusts of wind nor sleet and hail;
and especially not a negligent gardener (me).
I love Spring flowers!

Wednesday, March 30, 2011

To Quilt or Not to Quilt? What a Silly Question!

I finished piecing a quilt top this month that I started in 2005. That was the year that John and Mary Kennon were married. I told them I would make them a wedding quilt,
but they eloped to Seattle, so I figured I'd finish it for their 1st anniversary.
Life happened, including the escalating of my schoolwork with BYU,
and this ambitious project languished.

After my last summer term at BYU in 2008, I started working on it again. With about a third of it finished, John broke the news that he and Mary Kennon were separating.
We were so sad. I didn't have the heart to keep sewing on the quilt.

My final coursework for graduation from BYU kept me busy until April 2010,
but after I took the last test and finished the last paper, I found I had discretionary
time on my hands, so I exchanged one of my loves--reading, researching, and writing about literature--for another one of my loves--creating beautiful things with fabric.
Just to get started, I made myself a quilted purse out of some amazing coordinated fat quarters I had collected some years ago.

Fat Quarter Bag with multiple pockets inside
and out for organization

Next I tackled another project that had been three years in the queue. When Christina
graduated from high school I wanted to make her a quilt. We chose the pattern and bought the fabrics, but that's as far as it went. Now she was about to graduate from college, and I felt
an urgency to complete the quilt for her. By the time I needed to fly out to Utah for graduation I had finished piecing the top and had it more than half quilted. So she received a partially
completed quilt for graduation with the promise for the finished product when she started
graduate school in September.
Well, I missed that deadline, but I did finish it in October and took it to her personally when I went to visit for a long weekend.
The Campi di Flori quilt for Christina's graduation


After this achievement, I was on a roll.
I had another quilt top hanging on the upstairs banister that whispered, "Finish me, finish me." I call this my "Fall Flurry" quilt since the fabrics were leaf patterns, greens, golds, deep oranges, and maroons. I made this quilt top years ago as a "Mystery Quilt" challenge with two quilting friends, Susan Rasmussen and Carol Goe. We went to the quilt shop together and chose five fabrics that we would each use to make a specified number
of blocks in specified patterns. The border, backing, and binding fabric was our individual choice, as was how we arranged the blocks in the top. It was fun to see how differently the three quilts turned out, even though we each used the same fabrics and made the same blocks.
The "Fall Flurry" mystery quilt

I have another quilt top hanging on the banister, a "Country Village" block-of-the-month quilt that Susan, Carol, and I also did together over a year's time about ten years ago. But I think it is content to keep hanging there awhile longer because I don't hear any whisperings coming from that quarter. That's when Susan encouraged me to finish John and Mary Kennon's quilt, which I have now switched to calling the "Irish Chain" quilt.

It is a double Irish Chain pattern in two shades of blue and white with a creamy butter yellow for accent in the border. Susan felt, with justice, that if I could just get past the quilt's history, it would be perfect for my bedroom.
And of course, she's right. I love the Irish Chain pattern, and Val is partial to blues--seems a perfect fit. To give me added incentive, Susan gave me a fabulous birthday gift: when I have finished the Irish Chain quilt top, she will have me over to her house to cut fabric from her stash for me to use in a scrap quilt of my choice.
Talk about holding a carrot in front of my nose! Just what I needed to get sewing,
and now I'm finished.
And it is beautiful.

Trying out the Double Irish Chain quilt top on my bed.

Lest I forget, though, it still needs to be quilted. I'm off to the fabric store to get batting
and quilting thread! And looking forward to my date with Susan
to cut scraps!

Special Day

Special Day
With Victoria on her baptism day on November 1, 2008

Christmas Feast

Christmas Feast
Maxwell "cutting up" his wooden play food set from Grammie and Grandpa

Quilt For Maxwell

Quilt For Maxwell
This quilt I made for my grandson Maxwell is entitled "The Little Engine That Could". He is almost four years old now and he uses it on his bed and still puts things inside the pockets I sewed onto the box cars.